School holiday work
We regularly inspect and maintain schools as part of a comprehensive and ongoing program to keep school assets in optimal condition and to ensure the safety and wellbeing of our school community across more than 2200 NSW schools.
The school holidays are the ideal time for a lot of maintenance and project work to take place in schools without disrupting learning.
Planned work over the school holidays at some schools may involve working with hazardous materials such as asbestos or lead. This may include proactive inspection, sampling, remediation or removal of the material.
For more information on how we work with hazardous materials, please visit our Managing Materials web page.
Below are lists of schools that have work involving hazardous materials taking place during the upcoming school holiday period. Some schools receive more detailed communication about work taking place at their school. In these instances, communications are published on the SINSW school webpage (use the search bar on this website to find your school).
Check the list to find out if your school is included. All external work is subject to weather conditions. Please note:
- ACM refers to “asbestos-containing materials”.
- Safety measures, including air monitoring and fencing, will be in place as advised by the independent hygienist.
2025 Term 2 Winter School Holidays
Winter School Holidays - Works Notification
(PDF 115 KB)
School holiday work school list A-F
School |
What work we’re doing and where |
More detail about the work involving hazardous materials |
---|---|---|
Removal and replacement of flooring in a classroom in Building F. |
Removal of bonded asbestos in the vinyl tiles located under the existing flooring, as listed in the school's asbestos register. Material is currently undisturbed and in good condition. |
|
Structural repairs to Building J. |
Removal of subfloor packers and subfloor packing debris known to contain bonded asbestos before starting structural repairs to Building J. Material is listed in the school's asbestos register and is currently undisturbed. |
|
Resecuring electrical conduit to eaves in the outdoor areas of the school. |
Resecuring electrical conduit to eaves known to contain bonded asbestos in the outdoor areas of the school. |
|
Replacement of vermiculite ceilings throughout 5 blocks (buildings A, C, library, kitchens and textiles buildings). Building A and the library contain encapsulated lead dust in the ceiling. |
Remediation of encapsulated lead dust in ceiling cavities. Material is currently undisturbed and secured. |
|
Replacement of carpet in 3 classrooms in Building A. |
Removal of bonded asbestos in the vinyl tiles located under the existing flooring, as listed in the school's asbestos register. Material is currently undisturbed and in good condition. |
|
Replacement of eaves on the outside of Building E. |
Removal of bonded asbestos from the roof eaves, as listed on the school's asbestos register. Material is currently undisturbed and in good condition. |
|
Upgrades to the staff toilets and change rooms in the hall. Work includes the removal of wall tiles, flooring replacement, and the repainting of ceilings and walls. |
Removal of wall linings containing bonded asbestos. Material is currently undisturbed and in good condition. |
|
Excavation of soil to remove cable pits north of Building J. Work to be completed on Tuesday 8 July 2025 when no staff or students are onsite |
Cable pits are assumed to contain bonded asbestos. Outdoor areas have previously had bonded asbestos fragments found in the soil. |
|
Upgrade of the school's electrical distribution boards in Buildings B, D, E, G, F and H. |
Removal of suspected bonded asbestos located in a electrical distribution cupboard. Material is currently undisturbed and in good condition. |
|
Installation of 2 shade sails over playground and play equipment. |
No hazardous materials. |
|
Replacement of existing flooring across multiple rooms in Building A and D. |
Removal of bonded asbestos from the vinyl tiles, as listed in the school's asbestos register. Material is currently undisturbed and in good condition. |
|
Removal of vinyl tiles in Building E and eaves on Building A. |
Removal of vinyl tiles known to contain bonded asbestos in Building E and eaves known to contain bonded asbestos on Building A. |
|
Repainting sections of the internal walls of the General Assistant's Shed in Building B and repairs to the ceiling eaves north of Building E. |
Repainting sections of the internal walls known to contain bonded asbestos in the General Assistant's Shed in Building B and repairs to the ceiling eaves known to contain bonded asbestos outside the boys' toilets, north of Block E. |
|
Upgrade of the school's electrical distribution board in Building G - the old school house. |
Removal of suspected bonded asbestos located in a electrical distribution cupboard. Material is currently undisturbed and in good condition. |
|
Replacement of carpet in 4 classrooms in Building E. |
Removal of bonded asbestos from the vinyl tiles under the existing carpets, as listed in the school's asbestos register. Material is currently undisturbed and in good condition. |
|
Electrical upgrade works including replacing wall linings and electrical switchboard backing panels in a locked electrical distribution room in Building G. |
Removal of switchboard backing panels and wall linings containing bonded asbestos. Material is currently undisturbed and in good condition. |
|
Resurfacing the existing grounds of the infant playground, top playground and basketball court. |
No hazardous materials. |
School holiday work school list G-L
School |
What work we’re doing and where |
More detail about the work involving hazardous materials |
---|---|---|
Refurbishing the bathroom in C block near the basketball court. |
No hazardous materials. |
|
Remaining landscaping behind Building B left from last school holidays. Installation of small retaining walls, geotextile fabric and road base to encapsulate potential in-ground asbestos. |
The area behind Building B is known to have in-ground asbestos. This work will ensure material is encapsulated and soil is not washing away. There is no direct work with hazardous material i.e. no asbestos is being removed. |
|
Replacement of existing flooring across multiple rooms in Building G. |
Removal of bonded asbestos from the vinyl tiles under the existing flooring, as listed in the school's asbestos register. Material is currently undisturbed and in good condition. |
|
Replacing the vinyl tiles in the E Block bathroom. |
Removing and replacing the vinyl tiles in the E Block bathroom known to contain bonded asbestos. Material is currently undisturbed and in good condition. |
|
Removing and replacing asbestos tiles in the Administration Building. |
Removing and replacing vinyl tiles known to contain bonded asbestos in a movement area in the Administration Building. |
|
Replacing the floor covering in various classrooms, movement areas and the boys' toilets in Block D. |
Removing and replacing the floor covering in various areas in Block D known to contain bonded asbestos. Material is currently undisturbed and in good condition. |
|
Installation of handwashing sink in canteen. |
Drilling of holes into flooring for plumbing. Flooring is assumed asbestos and is currently undisturbed and in good condition. |
|
Roof replacement in Building A and Building E. |
Removal of bonded asbestos from the roof eaves, as listed on the school's asbestos register. Material is currently undisturbed and in good condition. |
|
Replacement of existing flooring in library office in Building E. |
Removal of bonded asbestos from the vinyl tile flooring, as listed in the school's asbestos register. Material currently undisturbed and in good condition. |
|
Upgrade of the school's electrical distribution boards in staff toilet. |
Removal of suspected bonded asbestos located in a electrical distribution cupboard. Material is currently undisturbed and in good condition. |
School holiday work school list M-S
School |
What work we’re doing and where |
More detail about the work involving hazardous materials |
---|---|---|
Conversion of a general learning classroom into a support classroom including upgrades to 2 bathrooms, new flooring, painting and new access door. |
Removal of bonded asbestos from the vinyl tiles under the existing flooring, as listed in the school's asbestos register. Material is currently undisturbed and in good condition. |
|
Floor repairs in the library and surrounding classrooms, Building K. |
Removal of bonded asbestos tiles under the existing flooring. Material is currently undisturbed and in good condition. |
|
Preparation for staff lounge refurbishment including removal of kitchen cabinetry and flooring in Building 5. |
Removal of cabinetry and flooring containing bonded asbestos. Material is currently undisturbed and in good condition. |
|
Conversion of 2 specialist classrooms into general learning classrooms in Building G. |
Removal of bonded asbestos from the vinyl tiles under the existing flooring, as listed in the school's asbestos register. Material is currently undisturbed and in good condition. |
|
Roof replacement in Building A and C. |
Removal of bonded asbestos in the roof eaves, as listed in the school's asbestos register. Material is currently undisturbed and in good condition. |
|
Digging holes to prepare for the planting of trees and shrubs across the school for Cooling the Schools program. |
Several outdoor areas have previously had bonded asbestos fragments found in the soil. |
|
Replacement of carpet in 2 classrooms in Building A. |
Removal of bonded asbestos from the vinyl tiles under the existing carpets, as listed in the school's asbestos register. Material is currently undisturbed and in good condition. |
|
Replacement of existing flooring in a staffroom in Building C and a classroom in Building D. |
Removal of bonded asbestos from the vinyl tiles under the existing flooring, as listed in the school's asbestos register. Material is currently undisturbed and in good condition. |
|
Replacement of existing flooring in 3 classrooms in Building G. |
Removal of bonded asbestos from the vinyl tiles under the existing flooring, as listed in the school's asbestos register. Material is currently undisturbed and in good condition. |
|
Replacing partition walls in the student toilet block within Building G. |
Replacing partition walls known to contain bonded asbestos in the student toilet block within Building G. |
|
Upgrade of the school's electrical distribution boards. |
Removal of bonded asbestos located in the school's electrical distribution boards. Material is currently undisturbed and in good condition. |
|
Removal of vinyl tiles in a small storeroom on first floor next to staff toilets in Administration Building. |
Removal of bonded asbestos vinyl tiles. Material currently undisturbed. |
|
Removing and replacing asbestos tiles in Building C and E. |
Removing and replacing vinyl tiles known to contain bonded asbestos in a classroom in Building C and the gymnasium in Building E. Material is currently undisturbed and in good condition. |
|
Structural repairs to Building E. |
Removal of eave sheets, subfloor packers and subfloor packing debris known to contain bonded asbestos before starting structural repairs to Building E. Material is listed in the school's asbestos register and is currently undisturbed. |
|
Removal of asbestos containing material in parts of the roof and eaves in the Building K gym next to the sports oval. |
Removing and replacing parts of the roof and eaves known to contain bonded asbestos in the Building K gym. Material is currently undisturbed and in good condition. |
School holiday work school list T-Z
School |
What work we’re doing and where |
More detail about the work involving hazardous materials |
---|---|---|
Preparation for mould remediation works including replacing floor coverings in Building E. |
Removal of floor coverings containing bonded asbestos towards the entry to principal office as well as movement area and clinic in Building E. Material is currently undisturbed and in good condition. |
|
Removing and replacing part of a wall in Building E. |
Removal of bonded asbestos sheeting located in the General Assistant's storage shed in Building E. |
|
Upgrading existing lights to LEDs in the basement of Building D. |
Upgrading existing lights to LEDs in the basement of Building D. The ceiling is known to contain bonded asbestos as listed in the school's asbestos register and is currently undisturbed. |
|
Replacement of carpet in a classroom and storeroom in Building D. |
Removal of bonded asbestos from the vinyl tiles under the existing carpets, as listed in the school's asbestos register. Material is currently undisturbed and in good condition. |
|
Upgrade of the school's electrical distribution boards in Building A. |
Removal of bonded asbestos located in the school's electrical distribution boards. Material is currently undisturbed and in good condition. |
|
Replacement of existing flooring in a storeroom and a Technological and Applied Studies (TAS) classroom in the TAS Building (B). |
Removal of bonded asbestos glue underneath flooring in the classroom and removal of vinyl tiles in the storeroom. Material is listed in the school's asbestos register and is currently undisturbed. |
|
Replacement of existing flooring in all rooms in Building A. |
Removal of bonded asbestos from the vinyl tiles under the existing flooring, as listed in the school's asbestos register. Material is currently undisturbed and in good condition. |
|
Replacement of existing flooring in all rooms in Building A. |
Removal of bonded asbestos from the vinyl tiles under the existing flooring, as listed in the school's asbestos register. Material is currently undisturbed and in good condition. |
|
Upgrade of the school's electrical distribution board in the school house building. |
Removal of suspected bonded asbestos located in a electrical distribution cupboard. Material is currently undisturbed and in good condition. |
|
Replacement of ceiling in student toilets in Building L. |
Removal of bonded asbestos in the ceiling panels, as listed in the school's asbestos register. Material is currently undisturbed and in good condition. |
|
Replacement of existing flooring in a staffroom in Building J. |
Removal of bonded asbestos from the vinyl tile flooring, as listed in the school's asbestos register. Material currently undisturbed and in good condition. |
|
Removal and replacement of flooring in a classroom in Building A. |
Removal of bonded asbestos in the vinyl tiles located under the existing flooring, as listed in the school's asbestos register. Material is currently undisturbed and in good condition. |