2023-24 summer school holidays
Work that may involve hazardous materials during the school holidays will take place at the below schools.
Check the list to find out if your school is included. All work is weather permitting. Please note, ACM refers to “asbestos containing materials”.
School holiday work school list
School |
What work we’re doing and where |
More detail about the work involving hazardous materials |
---|---|---|
Upgrading verandas and ceilings in Buildings C and D. |
Removal of damaged ceiling panels, known ACM. |
|
Replacing flooring in 11 rooms in the Administration Building (A). |
Removal of vinyl tiles containing known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in an interview room in the Administration Building (A) and a staffroom in the Library Building (B). |
Removal of vinyl tiles containing known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in the hallway of the Administration Building (Building J). |
Removal of vinyl tiles with known ACM. Currently undisturbed and in good condition. |
|
Replacing ceiling in the movement area of Building C. |
Replacing damaged external eave with known ACM. Area has been cordoned off. |
|
Fragments of asbestos found in sub floor of Builidng B and also fragments in the roof. |
Unexpected find when running pipework. All pieces are not damaged and intact. The area is locked off to all staff and students. |
|
Replacing flooring in 2 rooms in the Administration Building (Building A). |
Removing vinyl tiles with known ACM. Currently undisturbed and in good condition. |
|
Eave lining replacement in demountable classroom. |
Removal of eave lining with known ACM. Currently undisturbed and in good condition. |
|
Refurbishing the Practical Activities Area in between classrooms on the ground floor of Building A. |
Removal of vinyl tiles with known ACM and vermiculite covered sheeting above cupboards. Currently undisturbed and in good condition. |
|
Replacing external roofing on Administration Building (Building A). |
Removal of roof panels, known ACM. Currently undisturbed and in good condition. |
|
Refurbishment of Storage Room in Building A. |
Planned work involving Hazmat. The area is safe at present and will be cordoned off before work starts. |
|
Roof refurbishment (eaves and fascia) in Buildings A and G and flooring refurbishment in central corridors in Building A and a classroom in Building G. |
Removal of vinyl floor tiles under existing carpet, known ACM. Removal of eave and fascia sheets are known ACM. All ACM is currently undisturbed and in good condition. |
|
Refurbishment and repurpose of rooms to establish support classes in Building E. Work will include new walls, doors, carpet, vinyl tiles, celings, glazing and painting. |
Planned work involving Hazmat. Rooms still in use and will be cordoned off before work starts. |
|
Conducting external investigations and excavation work around the Administration Building (F). |
During investigations there may be internal work that could disturb vinyl tiles containing suspected ACM. Currently undisturbed and in good condition. |
|
Refurbishing selected ceiling sheets and soffits in Buildings A,B,C,D,E,F,L and N. |
Removal of ceiling sheets containing known ACM. Currently undisturbed and in good condition. |
|
Replacing ceiling and flooring to upgrade a storage room to a kitchen area in Building A. |
Removal of ceiling sheeting with known ACM. Currently secured. Removal of vinyl tiles with known ACM. Currently undisturbed and in good condition. |
|
Replacing damaged soffits in the walkway of Administration Building (Building D). |
Removal of ceiling eave panels with known ACM. Currently secured. |
|
Flooring refurbishment in the Library (Building A), wall and window refurbishment in a classroom and staff office in Building B . |
Removal of wall linings and vinyl floor tiles under existing carpet, known ACM. Currently undisturbed and in good condition. |
|
Replacement of carpet and vinyl tiles in classrooms in Building A. |
Planned work involving Hazmat. Room still in use and will be cordoned off before works start. |
|
Removing asbestos fragments underneath Building L. |
Removing material underneath the building with known ACM. Currently secured and inaccessible. |
|
Roof replacement in Building C. |
Remediation of roof cavity during roof replacement work, known to contain lead dust. Currently enclosed and undisturbed. |
|
Refurbishment of bathroom in General Learning Building A. |
Planned work involving Hazmat. Area safe at present and will be out of bounds during works. |
|
Flooring refurbishment throughout Building A. |
Removal of vinyl floor tiles under existing carpet, known ACM. Currently undisturbed and in good condition. |
|
Installation of additional drainage behind G and L buildings and the grounds north of T Building. |
Installing additional drainage at back of school as proactive measure to minimise erosion and maintain grass coverage in areas with known asbestos in ground, as per school's site specific management plan. |
|
Replacing flooring in the Library Building. |
Removal of vinyl tiles, known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in an office and storeroom in the Administration Building (Building A). |
Removing damaged vinyl tiles known to contain ACM in storeroom. Currently secured and inaccessible. Removing vinyl tiles with known ACM in office. Currently undisturbed and in good condition. |
|
Replacing wall panels in a classroom in Building L. |
Removal of wall linings with known ACM. Currently undisturbed and in good condition |
|
Replacing flooring in 6 classrooms in Building 1. |
Removal of vinyl tiles with known ACM. Currently undisturbed and in good condition. |
|
Replacing ceiling and eave sheets in the staff room area in demountable building at The Croft. |
Removal of ceiling and eave panels containing known ACM. Currently undisturbed and in good condition. |
|
Converting a storage area into a classroom in Building E. |
Removal of ceiling and partition panels, known ACM. Currently undisturbed and in good condition. |
|
Switchboard upgrade in Buildings A, B and D. |
Removal of switchboard panels with known ACM. Currently undisturbed and in good condition. |
|
New ceiling in an interview room in Building B. |
Remediation of roof cavity known to have lead containing materials in it. Currently enclosed and undisturbed. |
|
Roof raising and replacement in Building 1, including new guttering and electrial work. |
Removal of roof sheet with known ACM. Currently undisturbed and in good condition. |
|
Replacing windows and eaves in Building A and in the Administration Building (C). |
Replacing external eaves with known ACM. Currently undisturbed and in good condition. |
|
Replacing walls, ceiling materials and flooring in the Administration building (Building A) and library (Building D). |
Removal of wall and ceiling panels, and vinyl tiles under existing carperts with known ACM. Currently undisturbed and in good condition. |
|
Replacing wall linings in the Practical Activities Area in Building D. Replacing wall linings in the stairwells of Building E. Replacing flooring in classrooms of Building F. |
Removal of wall panels with known ACM. Currently secured. Removal of vinyl tiles with known ACM. Currently undisturbed and in good condition. |
|
Refurbishing student toilets in Building G. |
Removal of toilet partition panels containing known ACM. Currently undisturbed and in good condition. |
|
Carpet replacement in art classrooms, staff rooms and storerooms in Building F. |
Removal of vinyl tiles, known ACM. Currently undisturbed and in good condition. |
|
Switchboard upgrade in Building G. |
Removal of switchboard panels with known ACM. Currently undisturbed and in good condition. |
|
Switchboard upgrade in Buildings I, J and H. |
Removal of switchboard panels with known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in 5 rooms in the Administration Building. |
Removal of vinyl tiles containing containing known ACM. Currently undisturbed and in good condition. |
|
Repainting all external window frames of Building 1, which includes the library, hall and classrooms. |
Removal of lead containing paint from wooden window frames. Currently undisturbed and in good condition. |
|
Replacing components in the electrical switch room in Building D. |
Removal of electrical panel blocks containing known ACM. Currently undisturbed and in good condition. |
|
Upgrading the demountable classroom next to the library. |
Removal of eaves and ceiling panels and internal walls, known ACM. Currently undisturbed and in good condition. |
|
Upgrading a Support Classroom in Building M. |
Removal of vinyl tiles with known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in 2 classrooms, student toilets and a corridor in Building C. |
Removal of vinyl tiles and bitumen glue containing known ACM. Currently undisturbed and in good condition. |
|
Replacing eaves in Administration Building. |
Removal of external sheets containing known ACM. Currently undisturbed and in good condition. |
|
Refurbishing student toilets in Building A and staff toilets in Building C. |
Removal of toilet cubicle partitions containing known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in 2 classrooms and 2 storerooms in Building F. |
Removal of vinyl tiles with known ACM. Currently undisturbed and in good condition. |
|
Replacing roof and ceiling in student toilets in Building 13. |
Removal of panels, known ACM. Currently undisturbed and in good condition. |
|
Replacing eaves in Buildings F and H. |
Removal of sheets containing known ACM. Currently undisturbed and in good condition. |
|
Refurbishing student toilets on level 2 and ground floor in Building A and staff toilets on level 1 in Building C. |
Removal of toilet cubicle partitions containing known ACM. Currently undisturbed and in good condition. |
|
Replacing soffits on the Administration Building (A), as well as Buildings C and D. |
Removal of ceiling eave panels containing known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in 4 science labs and a preparation room in Science Building (S2). |
Removal of vinyl tiles and glue containing known ACM. Currently undisturbed and in good condition. |
|
Replacing components in the electrical distribution room in Building A. |
Removal of electrical panel blocks containing known ACM. Currently undisturbed and in good condition. |
|
Replacing components in the electrical switch room in the Support Unit Building (I). |
Removal of electrical panel blocks containing known ACM. Currently undisturbed and in good condition. |
|
Switchboard upgrade in the Administration/Science Building (A). |
Removal of switchboard panels containing known ACM. Currently undisturbed and in good condition. |
|
School hall upgrade. |
Removal of vinyl tiles containing known ACM in the hall foyer. Currently undisturbed and in good condition. |
|
Refurbishing three Practical Activities Areas on the ground floor of Building B. |
Removing vinyl tiles and glue with suspected ACM. Currently undisturbed and in good condition. |
|
Refurbishment of staff bathrooms in Building D. |
Removal of partition panels containing known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in 2 classrooms, a staffroom and a storeroom in Building K. |
Removal of vinyl tiles with known ACM. Currently undisturbed and in good condition. |
|
Replacement of vinyl tiles in Building E. |
Planned work involving Hazmat. Currently undisturbed as underneath carpet. |
|
Replacing flooring in a classroom and staff room in Building B. |
Removal of vinyl tiles containing known ACM. Currently undisturbed and in good condition. |
|
Removing and replacing vinyl floor tiles in the School Counselling Room. |
Planned work involving Hazmat. Currently undisturbed and in good condition. Room still in use and will be cordoned off before work starts. |
|
Replacing flooring under office counter, foyer, hallway and 2 office rooms in Building B. |
Removal of vinyl tiles, known ACM. Currently undisturbed and in good condition. |
|
Replacing toilet partition walls in Buildings B, C, H and I. |
Removal of partition wall panels in toilets, known ACM. Currently undisturbed and in good condition. |
|
Refurbishment of bathroom and ceiling sheeting and eaves in boys and girls bathrooms. Ground Floor Building G and Ground Floor Building H. |
Planned work involving Hazmat. Area currently cordoned off and out of bou |
|
Replacing ceiling linings in Building H corridor. |
Removal of ceiling materials, known ACM. Currently undisturbed and in good condition. |
|
Refurbishing the administration office including replacing flooring in Administration Building (A). |
Removal of vinyl tiles underneath carpet containing known ACM. Currently undisturbed and in good condition. |
|
Refurbishing student toilets in Building Z. |
Removal of panels with suspected ACM. Currently undisturbed and in good condition. |
|
Replacing a small portion of vinyl flooring in Building A, Ground Floor Storeroom. |
Removal of small portion of vinyl tiles containing known ACM. Currently undisturbed and in good condition. |
|
Converting existing canteen into a new art therapy room (Building H) and upgrade to Administration clerical area in staff offices (Building I). |
Removal of wall linings and vinyl tiles, known ACM. Currently undisturbed and in good condition |
|
Replacing a damaged ceiling in a classroom in Building C. |
Removal of ceiling panels containing known ACM. Panels currently covered and secured. |
|
Replacing eaves in Buildings F and H. |
Removal of external window panels containing known ACM. Currently undisturbed and in good condition. |
|
Roof refurbishment and lighting upgrades in student toilets in Buildings I and K. |
Removal of roof and ceiling panels and internal walls, known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in 2 storerooms in Building B and 2 walkways in Building M. |
Removal of vinyl tiles with known ACM. Currently undisturbed and in good condition. |
|
Replacing external eave on Building A. |
Replacing damaged external eave containing known ACM. Located on the south side of Building A, second storey. Area cordoned off. |
|
Replacing flooring in 8 rooms in the Administration Building (Building B). |
Removal of vinyl tiles containing containing known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in the Food Technology classroom in the Technological & Applied Studies Building (G). |
Removal of vinyl tiles and bitumen glue containing known ACM. Currently undisturbed and in good condition. |
|
Replacing windows in a classroom in the TAS Building (H) and a storeroom in the Art Building (S). |
Removal of window putty containing known ACM. Currently undisturbed and in good condition. |
|
Replacing ceilings in Buildings A and B. |
Removal of water damaged ceiling lining panels containing known ACM. Located in 1 classroom in Building A and 2 support unit classrooms in Building B. |
|
Replacing wall panels in an office space in the Library Demountable. |
Removal of wall panels with known ACM. Currently undisturbed and in good condition. |
|
Replacing ceiling on Northern side of Toilet Building (Building C). |
Replacing damaged external eave with known ACM. Area has been cordoned off. |
|
Refurbishment in Buildings A, B and I, and the weather shed. |
Removal of wall linings and vinyl floor tiles under existing carpet in Buildings A and B, known ACM. Currently undisturbed and in good condition. |
|
Refurbishment of ceiling in demountable Administration Building. |
Removal of ceiling sheets, known ACM. Currently undisturbed and in good condition. |
|
Refurbishment of Building A, replacing wall linings and ceiling panels. New practical activities area and pinboards in classrooms. |
Removal of wall linings and ceiling panels containing known ACM. Currently undisturbed and in good condition. |
|
Repainting all window sills in buildings A and D. |
Removing lead paint and repainting of window sills. |
|
Refurbishing selected ceilings in Buildings B, C and H. |
Removal of ceiling panels containing known ACM. Currently undisturbed and in good condition. |
|
Removal of old cabinetry and switchboard in a Learning Support Space in Building A. |
Removal of switchboard panels with suspected ACM. Currently undisturbed and in good condition. |
|
Remediation of mould in staff toilet in Building C. |
Repair of material containing mould. Area isolated until works completed. |
|
Switchboard upgrade in Building F. Replacement of external eaves in Building A. |
Removal of switchboard panel containing known ACM. Currently undisturbed and in good condition. Removal of eave panels, known ACM. Currently undisturbed and in good condition. |
|
Refurbishment of staff bathroom in E building |
Planned work involving Hazmat. Currently undisturbed and will be out of bounds during work. |
|
Crack found in eaves lining of ceiling and repair needs to be undertaken in South Eastern corner of Building H. |
Repair of crack containing known ACM. Area cordoned off with building site. |
|
Refurbishing practical activities areas in 6 demountable classrooms at the southern end of the school. |
Removal of wall panels suspected of ACM. (Removal if disturbed and confirmed ACM)Currently undisturbed and in good condition. |
|
Replacing external eave linings in the Administration Building (A) as well as Buildings B, C and D. |
Removal of eave panels, known ACM. Currently undisturbed and in good condition. |
|
New entry gate and painting in Building E. Ceiling replacement in Library. Area under Building C general storeroom asbestos removal. |
Work is currently being planned involving Hazmat. Building C area is currently undisturbed and will be out of bounds during work. |
|
Replacing flooring in 3 rooms in Building E. |
Removal of vinyl tiles containing containing known ACM. Currently undisturbed and in good condition. |
|
Refurbishing 3 Demountable classrooms, 1 on the Northern campus and two on the Southern campus. |
Removal of wall panels suspected of ACM. (Removal if disturbed and confirmed ACM)Currently undisturbed and in good condition. |
|
Refurbishment of female and male staff bathrooms in Administration/General Learning Building A. |
Planned work involving Hazmat. Area safe at present and will be out of bounds while works are being completed. |
|
Removing and replacing vinyl tiles, currently undisturbed. Food Tech area, Building C and Movement Area Building F. |
Planned work involving Hazmat. Room still in use and will be cordoned off before works start. |
|
Upgrading Administration Building (Building C), Staff Building (Building B) and Amenities Building (Building D). |
Removal of cracked external walls, known ACM. |
|
Replacing flooring in the utility room in the Administration Building and in classrooms in Building B. Replacing window panels in in Buildings B. |
Removal of window material and vinyl floor coverings, known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in the corridor of Building (Building D). |
Removal of vinyl tiles containing, known ACM. Currently undisturbed and in good condition. |
|
Replacing a damaged external eave sheet on Building F. |
Removal of eave sheet with known ACM. Currently secured. |
|
Roof replacement of Building B (Administration and kindergarten rooms). |
Remediation of roof cavity during roof replacement work, known to contain lead dust. Currently enclosed and undisturbed. |
|
Upgrading student toilets located in the Pre School Building (K) |
Removal of wall and ceiling linings in student toilets in Building K. Floor, wall and ceiling materials containing known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in 8 classrooms in the Buildings E and F. |
Removal of vinyl tiles containing containing known ACM. Currently undisturbed and in good condition. |
|
Replacing ceilings in student toilets Building B. |
Removal of ceiling panels containing known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in Buildings A and B. |
Removal of vinyl tiles containing containing known ACM. Currently undisturbed and in good condition. |
|
Replacing metal roofing on Building K. |
Removal of roof cavity material containing known lead and ACM. Currently encapsulated, undisturbed and in good condition. |
|
Removing and replacing eave lining in in Administration Building Z. |
Planned work involving Hazmat. Area safe at present and will be out of bounds during works. |
|
Replacing flooring in a storeroom in Afterschool Care Building (Building J). |
Removal of vinyl tiles containing, known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in 2 rooms in Library/Science Building C and 6 rooms in Technological & Applied Studies Building (F). |
Removal of vinyl tiles containing known ACM. Currently undisturbed and in good condition. |
|
Staff toilet upgrade in Building C. |
Removal of toilet cubicle partitions, known ACM. Currently undisturbed and in good condition. |
|
Refurbishment of all spaces in Building G, including 3 classrooms and a staff toilet. |
Removal of wall linings in staff toilets, ceiling cavity remediation and removing vinyl floor tiles in classrooms with known ACM. All material is currently undisturbed and in good condition. |
|
Replacing roof and ceiling materials in Building H. |
Removal of panels and material containing known LCM and ACM. Currently undisturbed and in good condition. |
|
Window upgrade - replacement of all external facing windows in Building A. |
Removal of putty and external window panels, known ACM. Currently undisturbed and in good condition. |
|
Window replacement in print room in Building A. |
Window frame putty is suspected ACM. Frame material is undisturbed. |
|
Flooring refurbishment in 4 classrooms in Building E. Repainting of external eaves in Buildings D and E. |
Upgrade of flooring containing known ACM. Currently undisturbed and in good condition. Damaged lead paint removal and repainting of external eave sheets. |
|
Converting 2 storerooms into an accessible toilet and shower change facility in Building H. |
Removal of wall and ceiling panels containing known ACM. Currently undisturbed and in good condition. |
|
Upgrading ceilings and eaves in kitchen and veranda in Building A. |
Removal of panels, known ACM. Currently undisturbed and in good condition. |
|
Roof refurbishment in Buildings A,B, C, D, E, F, I and J. Flooring replacement in one room in Building E. |
Removal of roof eaves and vinyl floor tiles, known ACM. Currently undisturbed and in good condition. |
|
Painting and ceiling refurbishment in 2 classrooms in Building H. |
Removal of lead containing paint and external eaves and ceiling panels, known ACM. Currently undisturbed and in good condition. |
|
Replacing sand in the sandpit located in the playground. |
Removal of old sand from the south-east corner of the playground with known ACM in ground. As per notification 3 November 2023. Area currently fenced off and out of bounds. |
|
Replacing flooring on first floor of Administration building (Building A). |
Removal of vinyl tiles containing containing known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in 4 classrooms in Building B and the Library in Building D. |
Removal of vinyl tiles with known ACM. Currently undisturbed and in good condition. |
Asbestos survey program
As part of our regular maintenance programs and to ensure the health and wellbeing of staff and students across the state, we are continuing our proactive surveying program for asbestos material over the Summer school holiday period.
Independent occupational hygienists have been engaged to test samples at the below schools. The rooms are currently in use as the material is undisturbed.
Following testing, the independent occupational hygienist will advise whether any action is required.
Asbestos survey program school list
School name |
Building/s where sampling is being conducted |
|
---|---|---|
Building D |
|
|
Building B |
|
|
Building I |
|
|
Building I |
|
|
Building A |
|
|
Building B |
|
|
Building F |
|
|
Buildings C and B |
|
|
Building E |
|
|
Building 1 |
|
|
Buildings C3 and L |
|
|
Building F |
|
|
Building C |
|
|
Building B |
|
|
Building F |
|
|
Building A |
|
|
Buildings HA and DA |
|
|
Buildings A, G and D |
|
|
Buildings A, C and D |
|
|
Buildings A, B, D and E |
|
|
Building F |
|
|
Buildings E, D and A |
|
|
Buildings P, L and M |
|
|
Buildings K and P |
|
|
Buildings D and E |
|
|
Building F |
|
|
Building D |
|
|
Building E |
|
|
Building E |
|
|
Buildings H and B |
|
|
Building D |
|
|
Building D |
|
|
B00A Building A |
|
|
Buildings C and I |
|
|
Building C |
|
|
Building C |
|
|
Building F1 |
|
|
Building 800 |
|
|
Building C |
|
|
Building B |
|
|
Building B |
|
|
Buildings D, S and L1 |
|
|
Building E |
|
|
Building E |
|
|
Building B |
|
|
Building B |
|
|
Building L |
|
|
Buildings A, C and E |
|
|
Buildings 1, 2, 3, 5, 6 and 7 |
|
|
Building 1A |
|
|
Science building, facilities building and Building L |
|
|
Building D |
|
|
Building E |
|
|
Building B |
|
|
Buildings A, D and L |
|
|
Building D |
|
|
Building 1 |
|
|
Building C |
|
|
B00B |
|
|
Building B |
|
|
Buildings D, H and E |
|
|
Building D |
|
|
Buildings H, M and N |
|
|
Building 10 |
|
|
Buildings B and D |
|
|
Building D |
|
|
Building I |
|
|
Building L |
|
|
Building A |
|
|
Building H |
|
|
Building C |
|
|
Building B |
|
|
Buildings C, D and E |
|
|
B00B |
|
|
Building A |
|
|
Building C |
|
|
Building L |
|
|
Building 2 |
|
|
Buildings D and E |
|
|
Building A |
|
|
Building A |
|
|
Building L |
|
|
Building E |
|
Asbestos survey program school list
School name |
Building/s where sampling is being conducted |
|
---|---|---|
Building D |
|
|
Building B |
|
|
Building I |
|
|
Building I |
|
|
Building A |
|
|
Building B |
|
|
Building F |
|
|
Buildings C and B |
|
|
Building E |
|
|
Building 1 |
|
|
Buildings C3 and L |
|
|
Building F |
|
|
Building C |
|
|
Building B |
|
|
Building F |
|
|
Building A |
|
|
Buildings HA and DA |
|
|
Buildings A, G and D |
|
|
Buildings A, C and D |
|
|
Buildings A, B, D and E |
|
|
Building F |
|
|
Buildings E, D and A |
|
|
Buildings P, L and M |
|
|
Buildings K and P |
|
|
Buildings D and E |
|
|
Building F |
|
|
Building D |
|
|
Building E |
|
|
Building E |
|
|
Buildings H and B |
|
|
Building D |
|
|
Building D |
|
|
B00A Building A |
|
|
Buildings C and I |
|
|
Building C |
|
|
Building C |
|
|
Building F1 |
|
|
Building 800 |
|
|
Building C |
|
|
Building B |
|
|
Building B |
|
|
Buildings D, S and L1 |
|
|
Building E |
|
|
Building E |
|
|
Building B |
|
|
Building B |
|
|
Building L |
|
|
Buildings A, C and E |
|
|
Buildings 1, 2, 3, 5, 6 and 7 |
|
|
Building 1A |
|
|
Science building, facilities building and Building L |
|
|
Building D |
|
|
Building E |
|
|
Building B |
|
|
Buildings A, D and L |
|
|
Building D |
|
|
Building 1 |
|
|
Building C |
|
|
B00B |
|
|
Building B |
|
|
Buildings D, H and E |
|
|
Building D |
|
|
Buildings H, M and N |
|
|
Building 10 |
|
|
Buildings B and D |
|
|
Building D |
|
|
Building I |
|
|
Building L |
|
|
Building A |
|
|
Building H |
|
|
Building C |
|
|
Building B |
|
|
Buildings C, D and E |
|
|
B00B |
|
|
Building A |
|
|
Building C |
|
|
Building L |
|
|
Building 2 |
|
|
Buildings D and E |
|
|
Building A |
|
|
Building A |
|
|
Building L |
|
|
Building E |
|
Asbestos survey program school list
School name |
Building/s where sampling is being conducted |
|
---|---|---|
Building D |
|
|
Building B |
|
|
Building I |
|
|
Building I |
|
|
Building A |
|
|
Building B |
|
|
Building F |
|
|
Buildings C and B |
|
|
Building E |
|
|
Building 1 |
|
|
Buildings C3 and L |
|
|
Building F |
|
|
Building C |
|
|
Building B |
|
|
Building F |
|
|
Building A |
|
|
Buildings HA and DA |
|
|
Buildings A, G and D |
|
|
Buildings A, C and D |
|
|
Buildings A, B, D and E |
|
|
Building F |
|
|
Buildings E, D and A |
|
|
Buildings P, L and M |
|
|
Buildings K and P |
|
|
Buildings D and E |
|
|
Building F |
|
|
Building D |
|
|
Building E |
|
|
Building E |
|
|
Buildings H and B |
|
|
Building D |
|
|
Building D |
|
|
B00A Building A |
|
|
Buildings C and I |
|
|
Building C |
|
|
Building C |
|
|
Building F1 |
|
|
Building 800 |
|
|
Building C |
|
|
Building B |
|
|
Building B |
|
|
Buildings D, S and L1 |
|
|
Building E |
|
|
Building E |
|
|
Building B |
|
|
Building B |
|
|
Building L |
|
|
Buildings A, C and E |
|
|
Buildings 1, 2, 3, 5, 6 and 7 |
|
|
Building 1A |
|
|
Science building, facilities building and Building L |
|
|
Building D |
|
|
Building E |
|
|
Building B |
|
|
Buildings A, D and L |
|
|
Building D |
|
|
Building 1 |
|
|
Building C |
|
|
B00B |
|
|
Building B |
|
|
Buildings D, H and E |
|
|
Building D |
|
|
Buildings H, M and N |
|
|
Building 10 |
|
|
Buildings B and D |
|
|
Building D |
|
|
Building I |
|
|
Building L |
|
|
Building A |
|
|
Building H |
|
|
Building C |
|
|
Building B |
|
|
Buildings C, D and E |
|
|
B00B |
|
|
Building A |
|
|
Building C |
|
|
Building L |
|
|
Building 2 |
|
|
Buildings D and E |
|
|
Building A |
|
|
Building A |
|
|
Building L |
|
|
Building E |
|