Replacing ceiling eave sheets in Building 6.
|
Removal of ceiling eave sheets containing known ACM in Building 6. Currently undisturbed and in good condition.
|
|
Replacing flooring in craft storeroom in Building 1.
|
Removal of vinyl tiles containing known asbestos. Currently undisturbed and in good condition.
|
|
Replacement of eaves in demountable classroom in Building D.
|
Removal and replacement of eaves with known ACM. Currently undisturbed and in good condition.
|
|
Replacing stage subfloor as part of school funded hall project in Building B.
|
Removal and replacing of stage subfloor containing known ACM. Currently undisturbed and in good condition.
|
|
Replacing eave sheets in Buildings B and F and the ceiling in the study in Building D.
|
Removal and replacement of eave sheets and ceiling containing known ACM.
|
|
Part of planned maintenance project upgrade. Remove and replace roof eave sheets in Building 1 staffroom.
|
Planned work to remove and replace roof eave sheets in Building 1 staffroom. Known ACM, currently undisturbed and in good condition.
|
|
Upgrading of electrical power board in Building A.
|
Removal of backing board material containing known ACM in Building A. Currently undisturbed and in good condition.
|
|
Upgrading of electrical power board in Building I.
|
Removal of backing board material containing known ACM in Building I. Currently undisturbed and in good condition.
|
|
Replacing flooring in the Cleaning Room in Building B.
|
Removal of vinyl tiles containing known ACM. Currently undisturbed and in good condition.
|
|
Replacing ceiling sheets in the hallway outside of the canteen in Building C.
|
Removal and replacement of ceiling sheets and ceiling containing known ACM.
|
|
Upgrading 3 electrical power boards across Buildings C, D and G.
|
Removal of backing board material containing known ACM in Buildings C, D and G. Currently undisturbed and in good condition.
|
|
Upgrading of electrical distribution board in a storeroom in Building C
|
Removal and replacement of electrical distribution board containing known ACM. Currently undisturbed and in good condition.
|
|
Upgrading 2 electrical power boards in Building G.
|
Removal of backing board material containing known ACM in Building G. Currently undisturbed and in good condition.
|
|
Replacing flooring in staffrooms in Building A, D and E.
|
Removal of vinyl floor tiles containing known ACM in Building A, D and E. Currently undisturbed and in good condition.
|
|
Planned work to remove and replace carpet and vinyl tiles in administration room Building E.
|
Removal of vinyl tiles containing known ACM. Currently undisturbed and in good condition.
|
|
Replacing flooring in staff toilet in the canteen building and the HSIE staff room in Building E.
|
Removal of vinyl floor tiles containing known ACM in the canteen staff toilet (area is currently locked and inaccessible), and in the HSIE staffroom (tiles are encapsulated).
|
|
Replacement of ceilings in a classroom and storeroom in Building K.
|
Removal of ceiling cavity material containing known lead.
|
|
Planned work replacing 5 windows on Level 2 Building D.
|
Remove and replace windows. Putty contains asbestos. Safety polyvinyl chloride (PVC) is currently covering the glass.
|
|
Removing sheeting in undercover entry verandah of Buildings B, L and E.
|
Removal and replacement of sheeting containing known ACM. Currently undisturbed and in good condition.
|
|
Replacing soffit linings in the verandah in Building 3.
|
Removal and replacement of soffit linings in the verandah in Building 3. Containing known ACM. Currently undisturbed and in good condition.
|
|
Upgrading of electrical distribution board in a storeroom in Building A and a storeroom in Building B.
|
Removal and replacement of electrical distribution boards containing known ACM. Currently undisturbed and in good condition.
|
|
Removal of ACM contained in toilet ceiling inside Building A
|
Removal of ACM contained within the toilet ceiling in Building A. The ceiling is undisturbed and in good condition.
|
|
Replacement of windows in the Administration Building (A).
|
Removal of window putty containing known ACM. Currently undisturbed and in good condition.
|
|
Upgrading the kitchenette in the library office.
|
Removal of vinyl floor tiles containing known ACM in Library building. Currently undisturbed and in good condition.
|