School holiday work
We regularly inspect and maintain schools as part of a comprehensive and ongoing program to keep school assets in optimal condition and to ensure the safety and wellbeing of our school community across more than 2,200 NSW schools.
The school holidays are the ideal time for a lot of maintenance and project work to take place in schools across the state without disrupting learning.
Planned work over the school holidays at some schools may involve working with hazardous materials such as asbestos or lead. This may include proactive inspection, sampling, remediation or removal of the material.
For more information on how we work with hazardous materials, please visit our managing materials web page.
Below are lists of schools that have work involving hazardous materials taking place during the upcoming school holiday period. Some schools receive more detailed communication about work taking place at their school. In these instances, communications are published on their SINSW school webpage (use the search bar on this website to find your school).
2023-24 summer school holidays
Work that may involve hazardous materials during the school holidays will take place at the below schools.
Check the list to find out if your school is included. All work is weather permitting. Please note, ACM refers to “asbestos containing materials”.
School holiday work school list
School |
What work we’re doing and where |
More detail about the work involving hazardous materials |
---|---|---|
Upgrading verandas and ceilings in Buildings C and D. |
Removal of damaged ceiling panels, known ACM. |
|
Eave lining replacement in demountable classroom. |
Removal of eave lining with known ACM. Currently undisturbed and in good condition. |
|
Replacing external roofing on Administration Building (Building A). |
Removal of roof panels, known ACM. Currently undisturbed and in good condition. |
|
Roof refurbishment (eaves and fascia) in Building A and flooring refurbishment in central corridors in Building A. |
Removal of vinyl floor tiles under existing carpet, known ACM. Removal of eave and fascia sheets are known ACM. All ACM is currently undisturbed and in good condition. |
|
Refurbishing selected ceiling sheets and soffits in Buildings A,B,C,D,E,F,L and N. |
Removal of ceiling sheets containing known ACM. Currently undisturbed and in good condition. |
|
Flooring refurbishment in the Library (Building A), wall and window refurbishment in a classroom and staff office in Building B . |
Removal of wall linings and vinyl floor tiles under existing carpet, known ACM. Currently undisturbed and in good condition. |
|
Roof replacement in Building C. |
Remediation of roof cavity during roof replacement work, known to contain lead dust. Currently enclosed and undisturbed. |
|
Replacing flooring in the Library Building. |
Removal of vinyl tiles, known ACM. Currently undisturbed and in good condition. |
|
Converting a storage area into a classroom in Building E. |
Removal of ceiling and partition panels, known ACM. Currently undisturbed and in good condition. |
|
New ceiling in an interview room in Building B. |
Remediation of roof cavity known to have lead containing materials in it. Currently enclosed and undisturbed. |
|
Roof raising and replacement in Building 1, including new guttering and electrial work. |
Removal of roof sheet with known ACM. Currently undisturbed and in good condition. |
|
Replacing walls, ceiling materials and flooring in the Administration building (Building A) and library (Building D). |
Removal of wall and ceiling panels, and vinyl tiles under existing carperts with known ACM. Currently undisturbed and in good condition. |
|
Refurbishing student toilets in Building G. |
Removal of toilet partition panels containing known ACM. Currently undisturbed and in good condition. |
|
Carpet replacement in art classrooms, staff rooms and storerooms in Building F. |
Removal of vinyl tiles, known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in 5 rooms in the Administration Building. |
Removal of vinyl tiles containing containing known ACM. Currently undisturbed and in good condition. |
|
Repainting all external window frames of Building 1, which includes the library, hall and classrooms. |
Removal of lead containing paint from wooden window frames. Currently undisturbed and in good condition. |
|
Upgrading the demountable classroom next to the library. |
Removal of eaves and ceiling panels and internal walls, known ACM. Currently undisturbed and in good condition. |
|
Replacing eaves in Administration Building. |
Removal of external sheets containing known ACM. Currently undisturbed and in good condition. |
|
Refurbishing student toilets in Building A and staff toilets in Building C. |
Removal of toilet cubicle partitions containing known ACM. Currently undisturbed and in good condition. |
|
Replacing roof and ceiling in student toilets in Building 13. |
Removal of panels, known ACM. Currently undisturbed and in good condition. |
|
Replacing eaves in Buildings F and H. |
Removal of sheets containing known ACM. Currently undisturbed and in good condition. |
|
Refurbishing student toilets on level 2 and ground floor in Building A and staff toilets on level 1 in Building C. |
Removal of toilet cubicle partitions containing known ACM. Currently undisturbed and in good condition. |
|
School hall upgrade. |
Removal of vinyl tiles containing known ACM in the hall foyer. Currently undisturbed and in good condition. |
|
Flooring refurbishment throughout Building A. |
Removal of vinyl floor tiles under existing carpet, known ACM. Currently undisturbed and in good condition. |
|
Refurbishment of staff bathrooms in Building D. |
Removal of partition panels containing known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in a classroom and staff room in Building B. |
Removal of vinyl tiles containing known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring under office counter, foyer, hallway and 2 office rooms in Building B. |
Removal of vinyl tiles, known ACM. Currently undisturbed and in good condition. |
|
Replacing toilet partition walls in Buildings B, C, H and I. |
Removal of partition wall panels in toilets, known ACM. Currently undisturbed and in good condition. |
|
Replacing ceiling linings in Building H corridor. |
Removal of ceiling materials, known ACM. Currently undisturbed and in good condition. |
|
Refurbishing student toilets in Building Z. |
Removal of panels with suspected ACM. Currently undisturbed and in good condition. |
|
Converting existing canteen into a new art therapy room (Building H) and upgrade to Administration clerical area in staff offices (Building I). |
Removal of wall linings and vinyl tiles, known ACM. Currently undisturbed and in good condition |
|
Replacing a damaged ceiling in a classroom in Building C. |
Removal of ceiling panels containing known ACM. Panels currently covered and secured. |
|
Replacing eaves in Buildings F and H. |
Removal of external window panels containing known ACM. Currently undisturbed and in good condition. |
|
Roof refurbishment and lighting upgrades in student toilets in Buildings I and K. |
Removal of roof and ceiling panels and internal walls, known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in 8 rooms in the Administration Building (Building B). |
Removal of vinyl tiles containing containing known ACM. Currently undisturbed and in good condition. |
|
Refurbishment in Buildings A, B and I, and the weather shed. |
Removal of wall linings and vinyl floor tiles under existing carpet in Buildings A and B, known ACM. Currently undisturbed and in good condition. |
|
Refurbishment of ceiling in demountable Administration Building. |
Removal of ceiling sheets, known ACM. Currently undisturbed and in good condition. |
|
Refurbishment of Building A, replacing wall linings and ceiling panels. New practical activities area and pinboards in classrooms. |
Removal of wall linings and ceiling panels containing known ACM. Currently undisturbed and in good condition. |
|
Refurbishing selected ceilings in Buildings B, C and H. |
Removal of ceiling panels containing known ACM. Currently undisturbed and in good condition. |
|
Replacement of external eaves in Building A. |
Removal of eave panels, known ACM. Currently undisturbed and in good condition. |
|
Refurbishing practical activities areas in 6 demountable classrooms at the southern end of the school. |
Removal of wall panels suspected of ACM. (Removal if disturbed and confirmed ACM)Currently undisturbed and in good condition. |
|
Replacing flooring in 3 rooms in Building E. |
Removal of vinyl tiles containing containing known ACM. Currently undisturbed and in good condition. |
|
Refurbishing 3 Demountable classrooms, 1 on the Northern campus and two on the Southern campus. |
Removal of wall panels suspected of ACM. (Removal if disturbed and confirmed ACM)Currently undisturbed and in good condition. |
|
Upgrading Administration Building (Building C), Staff Building (Building B) and Amenities Building (Building D). |
Removal of cracked external walls, known ACM. |
|
Replacing flooring in the utility room in the Administration Building and in classrooms in Building B. Replacing window panels in in Buildings B. |
Removal of window material and vinyl floor coverings, known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in the corridor of Building (Building D). |
Removal of vinyl tiles containing, known ACM. Currently undisturbed and in good condition. |
|
Replacing a damaged external eave sheet on Building F. |
Removal of eave sheet with known ACM. Currently secured. |
|
Roof replacement of Building B (Administration and kindergarten rooms). |
Remediation of roof cavity during roof replacement work, known to contain lead dust. Currently enclosed and undisturbed. |
|
Replacing flooring in 8 classrooms in the Buildings E and F. |
Removal of vinyl tiles containing containing known ACM. Currently undisturbed and in good condition. |
|
Replacing ceilings in student toilets Building B. |
Removal of ceiling panels containing known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in Buildings A and B. |
Removal of vinyl tiles containing containing known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring in a storeroom in Afterschool Care Building (Building J). |
Removal of vinyl tiles containing, known ACM. Currently undisturbed and in good condition. |
|
Staff toilet upgrade in Building C. |
Removal of toilet cubicle partitions, known ACM. Currently undisturbed and in good condition. |
|
Refurbishment of all spaces in Building G, including 3 classrooms and a staff toilet. |
Removal of wall linings in staff toilets, ceiling cavity remediation and removing vinyl floor tiles in classrooms with known ACM. All material is currently undisturbed and in good condition. |
|
Replacing roof and ceiling materials in Building H. |
Removal of panels and material containing known LCM and ACM. Currently undisturbed and in good condition. |
|
Window upgrade - replacement of all external facing windows in Building A. |
Removal of putty and external window panels, known ACM. Currently undisturbed and in good condition. |
|
Window replacement in print room in Building A. |
Window frame putty is suspected ACM. Frame material is undisturbed. |
|
Flooring refurbishment in 4 classrooms in Building E. |
Removing vinyl tiles under existing carpets, known ACM. Currently undisturbed and in good condition. |
|
Converting 2 storerooms into an accessible toilet and shower change facility in Building H. |
Removal of wall and ceiling panels containing known ACM. Currently undisturbed and in good condition. |
|
Upgrading ceilings and eaves in kitchen and veranda in Building A. |
Removal of panels, known ACM. Currently undisturbed and in good condition. |
|
Roof refurbishment in Buildings A,B, C, D, E, F, I and J. Flooring replacement in one room in Building E. |
Removal of roof eaves and vinyl floor tiles, known ACM. Currently undisturbed and in good condition. |
|
Painting and ceiling refurbishment in 2 classrooms in Building H. |
Removal of lead containing paint and external eaves and ceiling panels, known ACM. Currently undisturbed and in good condition. |
|
Replacing flooring on first floor of Administration building (Building A). |
Removal of vinyl tiles containing containing known ACM. Currently undisturbed and in good condition. |
Asbestos survey program
As part of our regular maintenance programs and to ensure the health and wellbeing of staff and students across the state, we are continuing our proactive surveying program for asbestos material over the Summer school holiday period.
Independent occupational hygienists have been engaged to test samples at the below schools. The rooms are currently in use as the material is undisturbed.
Following testing, the independent occupational hygienist will advise whether any action is required.
Asbestos survey program school list
School name |
Building/s where sampling is being conducted |
|
---|---|---|
Building D |
|
|
Building B |
|
|
Building I |
|
|
Building I |
|
|
Building A |
|
|
Building B |
|
|
Building F |
|
|
Buildings C and B |
|
|
Building E |
|
|
Building 1 |
|
|
Buildings C3 and L |
|
|
Building F |
|
|
Building C |
|
|
Building B |
|
|
Building F |
|
|
Building A |
|
|
Buildings HA and DA |
|
|
Buildings A, G and D |
|
|
Buildings A, C and D |
|
|
Buildings A, B, D and E |
|
|
Building F |
|
|
Buildings E, D and A |
|
|
Buildings P, L and M |
|
|
Buildings K and P |
|
|
Buildings D and E |
|
|
Building F |
|
|
Building D |
|
|
Building E |
|
|
Building E |
|
|
Buildings H and B |
|
|
Building D |
|
|
Building D |
|
|
B00A Building A |
|
|
Buildings C and I |
|
|
Building C |
|
|
Building C |
|
|
Building F1 |
|
|
Building 800 |
|
|
Building C |
|
|
Building B |
|
|
Building B |
|
|
Buildings D, S and L1 |
|
|
Building E |
|
|
Building E |
|
|
Building B |
|
|
Building B |
|
|
Building L |
|
|
Buildings A, C and E |
|
|
Buildings 1, 2, 3, 5, 6 and 7 |
|
|
Building 1A |
|
|
Science building, facilities building and Building L |
|
|
Building D |
|
|
Building E |
|
|
Building B |
|
|
Buildings A, D and L |
|
|
Building D |
|
|
Building 1 |
|
|
Building C |
|
|
B00B |
|
|
Building B |
|
|
Buildings D, H and E |
|
|
Building D |
|
|
Buildings H, M and N |
|
|
Building 10 |
|
|
Buildings B and D |
|
|
Building D |
|
|
Building I |
|
|
Building L |
|
|
Building A |
|
|
Building H |
|
|
Building C |
|
|
Building B |
|
|
Buildings C, D and E |
|
|
B00B |
|
|
Building A |
|
|
Building C |
|
|
Building L |
|
|
Building 2 |
|
|
Buildings D and E |
|
|
Building A |
|
|
Building A |
|
|
Building L |
|
|
Building E |
|