School holiday work
We regularly inspect and maintain schools as part of a comprehensive and ongoing program to keep school assets in optimal condition and to ensure the safety and wellbeing of our school community across more than 2200 NSW schools.
The school holidays are the ideal time for a lot of maintenance and project work to take place in schools without disrupting learning.
Planned work over the school holidays at some schools may involve working with hazardous materials such as asbestos or lead. This may include proactive inspection, sampling, remediation or removal of the material.
For more information on how we work with hazardous materials, please visit our Managing Materials web page.
Below are lists of schools that have work involving hazardous materials taking place during the upcoming school holiday period. Some schools receive more detailed communication about work taking place at their school. In these instances, communications are published on the SINSW school webpage (use the search bar on this website to find your school).
Check the list to find out if your school is included. All external work is subject to weather conditions. Please note:
- ACM refers to “asbestos-containing materials”.
- Safety measures, including air monitoring and fencing, will be in place as advised by the independent hygienist.
2025 Term 1 Autumn School Holidays
Autumn school holiday works notification
(PDF 117 KB)
School holiday work school list A-F
School |
What work we’re doing and where |
More detail about the work involving hazardous materials |
---|---|---|
Replacement of floor coverings in a classroom and hallway on Building C first floor |
Removal of existing vinyl flooring which contains bonded asbestos. Material currently undisturbed and in good condition. |
|
Refurbishing 2 student bathroom facilties in Building F. |
Replacing asbestos-containing ceiling sheets, which are currently undisturbed and in good condition. |
|
Refurbishment of 3 practical activity areas (Building B). |
Removing and replacing asbestos-containing vinyl floor coverings in 3 practical activity areas, which are undisturbed and in good condition. |
|
Concrete pour beside playground |
Concrete will be poured to level an area of the school grounds beside the playground and prevent any trip hazards. |
|
Refurbishing the girls' and boys' toilet block, cleaner's room and storeroom in Building A. |
The ceiling and eave sheets are known to contain bonded asbestos, currently undisturbed and in good condition. Refurbishment work will involve replacing the sheets with new material. |
|
Building B roof replacement, including asbestos removal from eaves. |
Removing assumed asbestos-containing eave linings, as part of roof replacement works, in Building B. |
|
Window replacement in a storeroom in Building D |
Removal of bonded asbestos in window frame putty in a storeroom in Building D. Material currently undisturbed and in good condition. |
|
Electrical switchboard upgrade in buildings C and N. |
Removal of known asbestos located in the electrical distribution board. |
|
Roof replacement - asbestos removal. |
Removing assumed asbestos-containing eave linings, as part of roof replacement works, in buildings A, B, C, D, E and F. The linings are listed in the school's asbestos register. |
|
Replacing soffit lining in Building F. |
Removing asbestos-containing soffit lining from Building F external movement area and replacing with fibre cement sheeting. |
|
Refurbishing the staff kitchen in Building A. |
The existing cabinetry is attached to a wall that contains bonded asbestos material, currently undisturbed and in good condition. The asbestos containing materials will be removed and replaced with new wall sheets, prior to installing the replacement cabinets. |
|
Raising the height of a dividing wall between a classroom and staffroom in Building A to meet the ceiling. |
Nil hazmat |
|
Removal of existing roof materials and roof replacement in 3 buildings; C Block (HC), Music and Textiles (C1) and TAS (C2). |
Removal of lead dust from the ceiling cavity. Material is currently undisturbed and encapsulated. |
|
Replacing eave sheets in Building E. |
Removing asbestos-containing eave sheets in the Building E movement area and replacing with fibre cement sheets. |
|
Removal of decommissioned pipe under Building D. |
Removal of cement pipe under Building D known to contain bonded asbestos. |
|
Installing aluminium windows and replacing the eave lining in Building E. |
Replacing eave linings, which contain undisturbed bonded asbestos and in good condition, with new lining material. |
|
Removal and replacement of stairs and landing in the demountable toilets. |
Removal of asbestos-containing stair tops and landing. |
|
Removing pieces of broken fibro from the subfloor of Building G. |
Removing pieces of broken fibro suspected to contain asbestos from the subfloor of Building G. |
|
Refurbishment of student toilet facilities in buildings A, B, C, D and E. |
Replacing asbestos-containing toilet partitions, which are currently undisturbed and in good condition. |
|
Staff room upgrades. |
An air conditioning unit, a new window and carpet will be installed in the Building A staff room 15. |
|
Flooring replacement in several locations. |
Removing vinyl floor tiles, which contain undisturbed bonded asbestos, and replacing with carpet in Building A and Building I movement areas and Building D and Building H classrooms. |
|
Refurbishing multiple rooms in Building A. |
Removal and replacement of known asbestos-containing wall panels, which are currently undistrubed and in good condition. |
|
Replacing the joinery cabinets in 2 practical activities areas (Building D). |
Replacing asbestos-containing vinyl floor before new joinery is installed. The existing floor tiles are undisturbed and in good condition. |
|
Replacing the floor coverings in the Building E staff room, administration area and comms room. Refurbishing the science lab, science preparation room and storeroom located in Building L. |
Replacing the Building E floor coverings is required to complete mould remediation work. Existing asbestos-containing vinyl floor coverings in buildings E and L are currently undisturbed and in good condition. The floor coverings will be replaced with new vinyl throughout both buildings, with carpet tiles added on top of new vinyl in the staff and admin areas of Building E. |
|
Screen door installation in Building B |
New screen doors will be installed in 3 Building B classrooms. |
|
Removal and replacement of exterior wall sheeting on performing arts building. |
Removal of suspected asbestos in the exterior wall sheeting. |
|
Window replacement in a metalwork classroom in Building F. |
Removal of bonded asbestos in window frame putty in a classroom in Building F. Material currently undisturbed and in good condition. |
|
Roof works on buildings B, C and S. |
Replacement of roofing and external building eaves on buildings B, C and S. No hazmat involved. |
|
Upgrading aluminium window frames in Building A. |
Removal of known asbestos containing material located in the window frames on Building A. |
|
Electrical switchboard upgrade on the outside of Building A. |
Removal of known asbestos located in the electrical distribution board. |
|
Removing and replacing the flooring in Waratah room, Kangaroo Paw room, Bunya room, Waratah Bag room and the hallway between Waratah and Kangaroo Paw rooms in Building C. |
Removing and replacing the carpet and vinyl tiles, known to contain bonded asbestos, under the carpet in various rooms and a hallway in Building C. |
|
Removing and replacing the flooring in Building E cleaners' storerooms. |
Removing the vinyl floor tiles known to contain bonded asbestos in the cleaners' storerooms in Building E. |
|
Removing and replacing the flooring in all movement areas in Building B and one movement area in Building C. |
Removing the vinyl floor tiles known to contain bonded asbestos and replacing with non-hazardous material in all movement areas in Building B and one movement area in Building C. |
School holiday work school list G-L
School |
What work we’re doing and where |
More detail about the work involving hazardous materials |
---|---|---|
Removing and replacing eaves in Building D student toilets. |
Removing and replacing asbestos-containing eaves, which are undisturbed and in good condition. |
|
Carpet replacement in Building A, B and H classrooms. |
Removal of known asbestos containing material located underneath the carpet. |
|
Removing and replacing the flooring in Waratah room, Kangaroo Paw room, Bunya room, Waratah Bag room and the hallway between Waratah and Kangaroo Paw rooms in Building C. |
Removing and replacing the carpet and vinyl tiles, known to contain bonded asbestos, under the carpet in various rooms and a hallway in Building C. |
|
Concrete pavement replacement |
Concrete pavement replacement works at the southern end of Building K. |
|
Replacement of gutters and downpipes to school hall and installation of strip drain |
Gutters and downpipes will be replaced and a strip drain will be installed to prevent water pooling. |
|
Removing and replacing the flooring in Building E cleaners' storerooms. |
Removing the vinyl floor tiles known to contain bonded asbestos in the cleaners' storerooms in Building E. |
|
Removal of gas heaters from classrooms in buildings A, C and D and replacement concrete in the quadrangle. |
Disconnecting gas heaters and removal of concrete followed by a concrete pour. |
|
Removing and replacing the flooring in all movement areas in Building B and one movement area in Building C. |
Removing the vinyl floor tiles known to contain bonded asbestos and replacing with non-hazardous material in all movement areas in Building B and one movement area in Building C. |
|
Refurbishing student toilet facilties in Building B, including replacing ceiling lining. |
Removal of known asbestos containing material located in the ceiling lining of toilets in Building B, which are currently undisturbed and in good condition. |
|
Roof replacement to buildings B, C and F. |
Removing and replacing asbestos-containing eaves, which are undisturbed and in good condition. |
|
Ceiling replacement in Building E corridors. |
Removal and replacement of known asbestos containing ceiling sheets |
|
Planned maintenance of the girls' toilet facilities, located in Building 3. |
Replacing asbestos-containing toilet partitions which are currently undisturbed and in good condition. |
|
Painting all buildings externals. |
All buildings on the school grounds will be painted externally. |
|
Planned maintenance of the girls' and boys' toilet facilities in Building D. |
The ceiling sheets and eaves are known to contain bonded asbestos, currently undisturbed and in good condition. Refurbishment work will involve replacing the sheets with new material. |
|
Refurbishing 2 student bathroom facilties in Building E. |
Replacing asbestos-containing toilet partitions, which are currently undisturbed and in good condition. |
|
Preparation for student toilet refurbishments including the removal of partition walls and eaves linings in the student toilets in Building B. |
Removal of partition wall linings and eaves containing bonded asbestos. Material is currently undisturbed and in good condition. |
|
Replacing the rubberised soft fall ground covering under the play equipment. |
N/A |
|
Concrete replacement in infant quadrangle. |
Concrete will be poured to level an area of the school grounds and prevent any trip hazards. |
School holiday work school list M-S
School |
What work we’re doing and where |
More detail about the work involving hazardous materials |
---|---|---|
Flooring replacement in Building D. |
Removing vinyl floor tiles, which contain undisturbed bonded asbestos, and replacing with carpet in 4 Building D classrooms. |
|
Installing a new doorway and ramp to play area from Building J. |
Removing an external asbestos-containing wall from classroom to create a doorway. |
|
Fence installation - agricultural shed area |
Existing temporary fencing will be removed and replaced with permanent fencing around the agricultural shed area |
|
Air conditioning, painting, carpet and fencing work |
A new air conditioning unit will be installed in Building 7; painting and carpeting will take place in 1 Building 9 room and 2 Building 10 rooms; new fencing will be installed around the agriculture plot. |
|
Asbestos removal - vinyl tiles and ceiling linings |
Removing asbestos-containing vinyl floor tiles and replacing with carpet in a Building C classroom, the entry/administration area and a small section in a Building D internal movement area. Asbestos-containing ceiling linings will be removed from covered walkway connecting buildings D and E. |
|
Accessibility upgrades to the girls' and boys' toilet facilities in Building A, including installation of handrails and ramps. |
Removing and replacing the exisisting ceiling sheets, known to contain bonded asbestos. |
|
Repairing the movement area roof in Building A. |
Removing and replacing eave sheets known to contain bonded asbestos. |
|
Preparation for student toilet refurbishments including the removal of ceiling linings in the toilets in Building B. |
Removal of ceiling linings containing bonded asbestos. Material is currently undisturbed and in good condition. |
|
Refurbishing the Building E science lab. |
The science lab fume cupboard, known to contain bonded asbestos, will be removed and a replacement fume cupboard will be installed as part of planned refurbishment work. |
|
Roof replacement on Building J. |
Removal of known-asbestos containing eaves and fibro cement sheeting in the roof. |
|
Removing and replacing ceiling and wall linings in staff toilets, movement area and storeroom in Building A. |
Removing and replacing the ceiling and wall linings known to contain bonded asbestos in the male and female staff toilets, movement area and storeroom in Building A. |
|
Removal and replacing concrete footpath at the main school entrance. |
Concrete will be jackhammered to remove old footpath and new concrete will be poured to prevent any trip hazards. |
|
Flooring replacement and kitchenette in Building G. |
Removing and replacing asbestos containing vinyl tiles, which are undisturbed and in good condition. |
|
Construction of a concrete slab and shade shelter between buildings B and G. |
Concrete will be poured to create a new slab, and a shade shelter will be built. |
|
Upgrading of student toilets in the school hall and replacement of flooring in the administration building storerooms. |
Removal of known asbestos in the partitions in the student toilets in the school hall. Removal of known asbestos-containing vinyl tiles underneath the flooring in the administration building storerooms. |
School holiday work school list T-Z
School |
What work we’re doing and where |
More detail about the work involving hazardous materials |
---|---|---|
Replacing floor coverings in the administration area, 2 classrooms, library, 2 storerooms and hallways of Building A with new vinyl flooring and carpet tiles. |
Removing the existing vinyl floor coverings, known to contain bonded asbestos which are currently undisturbed and in good condition, and replacing with new vinyl flooring and carpet tiles. |
|
Removing and replacing eaves in Building A. |
Removing and replacing asbestos-containing eaves, which are undisturbed and in good condition. |
|
Converting a room into a multi-categorial classroom (MC class) in Building C. |
Work includes replacing flooring, installing a kitchenette, plumbing and electrical work. Assumed asbestos-containing floor coverings will also be removed and replaced. |
|
Replacement of flooring in the Building A executive staff hallway. |
Removal of known asbestos containing material located in the vinyl tiles under the carpet in the Building A executive staff hallway. |
|
Electrical switchboard upgrade on the outside of the school residence building. |
Removal of known asbestos located in the electrical distribution board. |
|
Replacing vinyl floor coverings in the classrooms, storerooms and walkway of Building E with new vinyl flooring and carpet tiles. |
Removing and replacing asbestos-containing vinyl floor coverings, which is in good condition, with new vinyl flooring and carpet tiles. |
|
Lead paint removal in Building B. |
Removing lead-based paint from timber window frames in 4 Building B classrooms and repainting. |
|
Removing and replacing the carpet in all classrooms in Building F and one classroom in Building J. |
Removing and replacing the carpet and vinyl tiles under the carpet in all classrooms in Building F and one classroom in Building J. The vinyl tiles in these classrooms are known to contain bonded asbestos. |
|
Refurbishing the Building B girls' changeroom. |
Removing and replacing asbestos-containing toilet partitions, which are undisturbed and in good condition. |
|
Installing air conditioning in Building E. |
Nil hazmat |
|
Replacing flooring in hallway in Building A. |
Replacing asbestos-containing vinyl floor coverings in hallway, which are undisturbed and in good condition. |